Commercial Division
| Adams Mark Hotel - San Antonio, TX |
 |
 |  |  | PROJECT: ADAMS MARK HOTEL | | LOCATION: SAN ANTONIO, TX | | ARCHITECT: HBE CORPORATION | | CONTRACTOR: HBE CORPORATION | | COMPLETE: 1997 | SCOPE: 40,000 sft mechanically attached granite veneer and Italian Travertine, ceramic tile, marble counters (included: waterproofing, joint sealant, shop drawings, engineered attachments, imported marble and travertine from Italy, ceramic tile in 250 guest rooms, quarry tile in kitchen, compressed schedule) |
 |
| Blossom Natatorium - San Antonio, TX |
 | PROJECT: BLOSSOM NATATORIUM | | LOCATION: SAN ANTONIO, TX | | ARCHITECT: RVK ARCHITECTS | | CONTRACTOR: SPAW GLASS CONTRACTORS, INC. | | COMPLETE: 2001 | SCOPE: 20,000 sft ceramic tile restroom showers, floors, base and walls and pool deck. (included : mortar bed with sloping, waterproofing and drain flashing, epoxy grout and compressed schedule) |
 |
| Fountainhead Building - San Antonio, TX |
 | PROJECT: FOUNTAINHEAD OFFICE BUILDING | | LOCATION: SAN ANTONIO, TX | | ARCHITECT: HOUSE REH BURWELL | | CONTRACTOR: JOERIS, INC. | | COMPLETE: 2000 | SCOPE: 7,500 sft travertine and marble flooring, mechanically attached wall travertine, ceramic tile and granite vanities. (included : waterjet cut circles, shop drawings, stone imported from Mexico)
|
 |
| Hilton Bergstrom Airport Hotel- Austin, TX |
 |
 |  | PROJECT: HILTON BERGSTROM AIRPORT HOTEL | | LOCATION: AUSTIN, TX | | ARCHITECT: MITCHELL CARLSON STONE, INC. | | CONTRACTOR: LANDMARK ORGANIZATION, INC. | | COMPLETE: 2000 | SCOPE: 25,000 sft sandstone flooring, 346 granite vanities, lobby granite tops, exterior adhered veneer, and quarry tile. (included : extensive floor prep., expansion joint design, sealer, compressed schedule)
|
 |
| Main Library - San Antonio, TX |
 | PROJECT: SAN ANTONIO MAIN LIBRARY | | LOCATION: SAN ANTONIO, TX | | ARCHITECT: JOHNSON-DEMPSEY & ASOCIATES | | CONTRACTOR: H. A. LOTT CONSTRUCTION | | COMPLETE: 1995 | SCOPE: 50,000 sft sandstone flooring, exterior adhered veneer, coping and fountain. (included : waterproofing, joint sealant, shop drawings, and engineered attachments) |
 |
| Mercy Regional Medical Center - Laredo, TX |
 |
 |  | PROJECT: MERCY REGIONAL MEDICAL CENTER
| LOCATION: LAREDO, TX
| ARCHITECT: HKS ARCHITECTS
| CONTRACTOR: ROBINS & MORTON, INC.
| COMPLETE: 1999
| SCOPE: 125,000 sft adheered veneer sandstone, mechanically attached columns, base, soffits, cornice, headers, elevator surrounds, monumental staircase, slate countertops and misc. features. (included : extensive use of Laticrete waterproofing product over cementitious sheathing, joint sealant, shop drawings, engineered attachments, imported stone from England (Burlington Slate) and Mexico (Adoquin Sandstone), over 50,000 man hours of labor.)
|
 |
| Valero Energy I - San Antonio, TX |
 |
 |  | PROJECT: VALERO ENERGY I
| LOCATION: SAN ANTONIO, TX
| ARCHITECT: RVK ARCHITECTS
| CONTRACTOR: SPAW GLASS CONTRACTORS, INC.
| COMPLETE: 1998
| SCOPE: 20,000 sft 1-1/4" thick granite flooring, walls, base, soffits (curved), vanities and stair treads. (included : shop drawings, engineered attachments, complex layout, roof terrace pedastal pavers, welding, steel back-up framework, sandblasting and extensive coordination with drywall sub on layout of his work.)
Delta Granite and Marble was selected to perform the granite work on Valero II
|
 |
Back To Commercial Profile
|
|
|
|
|
|